JOB Medco Tomori Sulawesi

Performa dan prestasi PDSI:

  • Rig N110UE/59 works 41 days ahead of target, saving our customer 30 percent of their cost or equal to 45,000 USD.
  • The performance of Rig N1500/60 saves up to 46,500 USD or around 17 per cent
  • 6,142,500 USD of lost opportunity from daily operating cost (THO)
  • PDSI upholds its commitment to conduct and satisfy ModuSpec recommendations in spite of the new rig condition for a cost of approximately 200,000 – 500,000 USD
Exxon Banyu Urip

PDSI Performance and achievement :

  • Work for a total of 500 days ahead of the timeline at Wellpad B and C using rig DS8 and DS9, or 250 days ahead in the respective wellpad.
  • On the basis of 98% productivity assumption, lost opportunity of PDSI daily operating cost (THO) is equal to approximately 20.8 million USD.
  • Activities at Wellpad A using rig DS8 is estimated to go faster by 30 days. PDSI lost opportunity of THO is equal to approximately 1.25 million USD (98% productivity assumption).
  • HSE Excellence Award from EMCL Group
Pamaguan VICO Sulawesi

PDSI Performance and achievement

  • Up to 164 USD per feet is saved in drilling to the depth of 5,800 feet.
  • Cost efficiency compared to AFE is equal to approximately 981,000 USD
  • Moving time cut down from 15 to 11 days.
  • Completion phase concluded in 2.1 days from the targeted 3 days.
  • Project concluded in just 27.5 days from initially 31.8 days planned, with total daily operating cost (THO) of 46,500 USD
Sungai Gelam SGC 23X Jambi PEP

PDSI Performance and achievement

  • Zero accident
  • Optimum performance, zero non-productive time (NPT)
  • Drilling completed 9 days ahead of target
  • Engineering estimate cost: 56.58 per cent
Bunyu 173 Kalimantan PEP

PDSI Performance and achievement

  • Zero accident
  • Optimum performance, zero non-productive time(NPT)
  • Drilling completed 11 days ahead of target
  • 650 BOPD of initial output
  • Engineering estimate cost: 56.58 per cent
Directional Drilling Exploration JAS 2 PEP

Performa dan prestasi PDSI:

  • Zero accident in Drry-Hole drilling
  • Optimum performance, zero non-productive time (NPT)
  • Drilling completed 12 days ahead of target